Environmental work at the Rosentor residential complex, Rapperswil-Jona

Do you like the blog? Please let us know.

Rosenstadt Rapperswil-Jona is being given a new housing estate called ā€žRosentorā€œ. This will create a diverse mix of 40 new 2.5 to 5.5 room flats at the foot of the Meierberg. Four blocks of flats will be built in total.

Pictures from spring 2023

Creation of access paths and protection from wind and weather

Our work began at the end of March 2023 and our team only started work on the surrounding area once the apartment blocks had been completed. This included laying the access paths, which were prepared and asphalted in various stages by our surfacing group.

To protect the faƧades of the new apartment blocks from rain, we covered the faƧade strip with rubble. At the same time, the strip also helps with water drainage.

Creation of access routes and filling with rubble

A harmonious environment for young and old

The open-plan flats will have a suitable garden area and harmonious surroundings. Between the houses and away from the street, a courtyard is being created that has something to offer for all age groups. Concrete seating elements invite you to spend cosy summer afternoons in the shade of the trees. A striking rose gate will be a characteristic feature of the housing estate.

In future, the children will have a playground right on their doorstep. They can let off steam on the climbing frame and improve their balance at the same time.

PROGRESS OF THE ISSUE

Roses and other plants for the new housing estate

The planting strips on the upper level are already thriving. The blue-violet flowers of the meadow cranesbill and the bright yellow colour of the coneflower are particular eye-catchers. The last plants are also still finding their place in this housing estate. Ground cover roses are also planted to honour the rose gate.

The first owners and tenants have been living in the new development since spring 2023. The project should be completed at the end of this year, after the last plants have been given their future home.

Care of the planting strip

Facts & Figures

Start: March 2023
Construction time: approx. 9 months
Completion: 2023
Team: 3 - 4 persons

Planting

Trees

  • Acer campestre
  • Alnus incana ā€šLaciniataā€˜
  • Betula pendula
  • Fagus sylvatica ā€šAtropuniceaā€˜
  • Prunus avium
  • Tilia cordata ā€šWinter Orange ā€š

Hedges and shrubs

  • Carpinus betulus
  • Ligustrum vulgare
  • Crataegus monogyna
  • Pinus mugo
  • Sorbus aucuparia ā€šRossica Majorā€˜
  • Sambucus nigra
  • Taxus baccata

Grasses

  • Rudbeckia fuldiga (var. Sullivantii)
  • Carex foliosissima ā€šIrish Greenā€˜
  • Miscanthus sinesis ā€šGracillimusā€˜
  • Panicum virgatum ā€šRotstahlbuschā€˜
  • Pennisetum alopecuroides ā€šHamelnā€˜

Perennials

  • Alchemilla mollis
  • Astrantia major
  • Campanula trachlium
  • Geranium sanguineum ā€šMax Freiā€˜
  • Geranium pratense ā€šJohnson's Blueā€˜
  • Geranium wallichianum ā€šRozanneā€˜

Climbing plants

  • Parthenocissus tricuspidata ā€šVeitchiiā€˜
  • Hedera helix ā€šWoernerā€˜

Roses

  • Ground cover rose mix

Leave a Reply

Your email address will not be published. Required fields are marked *

We look forward to hearing more about your ideas.

egli jona ag
Buechstrasse 38
8645 Rapperswil-Jona

TelĀ 055 224 30 30
MailĀ info@eglijona.ch